Body Work Round 3!

 Progress Continues

Both bedsides are replaced and the rear sill is next.




I also picked up a small batch of powder coated parts and got to visit with "Vulcan" the Cane Corso (Italian Mastiff). He looks and barks like a fierce beast, but he is a total sweetheart.


Next up for the 40? Refitting the springs on the chassis, the rear sill and sill cover, LOTS of unneeded hole patching in the floor pans, and patching the passenger side outer sill.




Comments

Popular posts from this blog

The Absentee Builder

Home!

Lots of Mockup!